The 249’ two-span bridge over I-690 was erected by BVR Construction during nightly closures of I-690, High Steel Structures was responsible for fabrication. The bridge was constructed to allow access from the NYS Fairgrounds Orange parking lot to I-690E in Syracuse NY.
Mezzanine stair and guard railing at the Amazon Warehouse project, Liverpool, NY. Detailed, fabricated and installed by Titan Steel Corp. Dec 2020
Installation of mezzanine stair at the Amazon Warehouse project, Liverpool, NY. Titan Steel Corp. and Iron Workers from Local 60, Syracuse, NY. Dec 2020